1.在TC提供的報價資料基礎(chǔ)上,對工藝流程提出改進建議,按照工程下發(fā)的圖紙及技術(shù)要求,消化工藝標準和要求,協(xié)助采購部門明確產(chǎn)品的原材料性能要求,明確產(chǎn)品性能要求、產(chǎn)品的結(jié)構(gòu)特點及產(chǎn)品的工藝特點。 2. 完成項目各個階段的試制及驗證,解決試制問題,完成工藝驗證報告。 3.完成新產(chǎn)品的制造過程流程方案,努力達成制造成本節(jié)儉,制造效率提升、制造不良率降低。 4.負責分析新項目中所需的工裝、胎具、夾具、模具、設(shè)備、工具、輔助設(shè)備等工作,制定其技術(shù)要求并負責與供應(yīng)商進行技術(shù)交流,參與其試制、驗收、調(diào)試工作,并依據(jù)項目進度安排制造工程團隊的試制、驗收、調(diào)試的計劃。 5.負責解決制造過程中的問題,并在制造過程中向產(chǎn)品工程師、采購工程師、結(jié)構(gòu)設(shè)計師反饋問題。 6.負責在整個制造過程中達成報價工時目標,并通過適用新工藝,新技術(shù)等努力降低產(chǎn)品制造工時、降低產(chǎn)品在工序中的生產(chǎn)節(jié)拍、減少作業(yè)人員來實現(xiàn)效率最高化,產(chǎn)品利潤最大化。 7.負責編制項目開發(fā)階段的制造類相關(guān)文件并在SOP前達成B版的標準,完成項目組要求的關(guān)控類文件。 8.提供相關(guān)資料,協(xié)助完成工廠整體生產(chǎn)布局、包裝工位器具、物料貨架的制作工作。 9.負責新項目、新產(chǎn)品開發(fā)過程中新技術(shù)引進、適用、總結(jié)和傳授工作。 10.完成新項目開發(fā)中的VA/VE工作。 11.完成上級指派的其他業(yè)務(wù)工作。 1. Be responsible for the quotation package of new project based on the quotation information provided by Technology Center 2. Complete the trial production and validation at all stages of the project, solve the trial production problem, and complete the process validation report 3. Complete the manufacturing process plan of new products, strive to achieve economical manufacturing cost, improve manufacturing efficiency and reduce manufacturing defect rate 4. Responsible for the analysis of the tooling, fixtures, molds, equipment, tools and auxiliary equipment required in the new project, formulate technical requirements, participate in its trial production, acceptance and debugging, and arrange the manufacturing engineering team's trial production, acceptance and debugging plan according to the project schedule. 5. Responsible for solving problems in manufacturing process and feedback problems to product engineer, procurement engineer and structural designer during manufacturing process 6. Be responsible for achieving the labor-hour target in the whole manufacturing process, and achieve the highest efficiency and maximum product profit through the application of new process 7. Responsible for the preparation of manufacturing related documents at the project development stage and reaching the standard of version B before SOP 8. Assist to complete the production layout of the factory, packaging equipment and material shelves 9. Be responsible for new technology introduction, application, summary and teaching in new project 10. Complete VA/VE work in new project development 11. To complete other business tasks assigned by superiors